The housing stock sets the job
Milford has a lot of 1940s to 1970s capes and colonials, many with two or three layers of shingle already on them and plank or early plywood decking underneath. Beach houses in Devon, Walnut Beach and Woodmont have taken 60 years of salt spray. Subdivisions toward Orange and the Wheelers Farms area are newer, with truss roofs and a single layer.
How a deck fails depends on what it is made of. Old plank decks lose their nail holding power at the gaps; early plywood delaminates where ice dams sat along the eaves; and on beach houses corrosion destroys the fasteners before the shingle wears out. The tear-off reveals all of this, so each estimate carries a deck replacement allowance, priced per sheet and charged only when used.
The layers, from the deck up
After tear-off and deck repair, ice and water barrier goes on every eave to a point at least 24 inches past the inside of the exterior wall, plus every valley, around every penetration and up every sidewall. On a low-pitch section under 4 in 12 the whole plane gets barrier.
Synthetic underlayment, not felt, covers the remaining deck. At the eaves, metal drip edge goes on under the barrier, and at the rakes over the underlayment. A starter strip runs the perimeter, adhesive line facing out, which lets the first course seal against wind uplift.
We then lay architectural shingles with six nails apiece, set on the nail line. Wind speeds on the shoreline exceed those inland in Connecticut, and a four-nail pattern explains why so many tabs land in the yard after a February gale.
Ventilation and the ice dam problem
Two gable vents and nothing more were the ventilation in most older Milford attics. Winter then leaves the roof deck too warm, so snow melts from beneath and refreezes at the gutter. Fixing this costs least during a re-roof. We cut a continuous ridge vent, check that the soffits are open and baffled, and match the intake size to the exhaust.
Where soffits are shut or no overhang exists, edge vents or smart vents stand in. Whichever we use, ridge and soffit should share equally the net free vent area, which should be 1 square foot per 300 square feet of attic floor.
Permits, inspections and the paperwork
A roof replacement in Milford needs a building permit, which we file ahead of the job. The inspector generally looks at the ice barrier and deck before field shingles go down, so the crew schedules the day around that visit.
Homeowners are handed the permit number the manufacturer's warranty registration, and photographs of the deck as it was before being covered over. Should anyone later wonder what lay beneath the old roof, those photos answer it.
A typical day on site
For a typical cape of 20 to 30 squares, a crew of five or six finishes the tear-off and new roof in one day. Larger colonials with dormers, or houses needing three layers stripped, take two days. We tarp the landscaping, cover the driveway under the dumpster, and magnet-sweep the yard for nails before leaving.